The New Rules for Hardscapers in Ottawa, and What to Check Before You Hire

Large-format paver patio with armour stone boulders and a low stone wall with built-in lights, built by WLS Landscaping

Ottawa now licenses hardscaping contractors. If you’re planning a patio, a new walkway or a retaining wall for next season, that’s good news. It gives you one more thing you can check yourself before anyone puts a shovel in your yard.

Here’s what the City’s licence covers, what it doesn’t, and the five checks we’d make on any contractor, including us.

What Ottawa’s hardscaping contractor licence covers

According to the City’s Hardscaping Contractor Licence page, a licence is required for any business that installs, alters or paves hard landscaping on private property. That includes:

  • driveways and parking areas
  • concrete pads and gravel areas
  • retaining walls and steps
  • walkways, pathways and patios

It applies when those features are made of asphalt, concrete, interlock, pavers, flagstone, brick or similar materials. It also applies when a contractor alters or paves part of the City’s road allowance as part of the same job, which is often the end of a driveway or walkway.

The City says a licence isn’t required for sealing a driveway on its own, or for installing pools, decks and fences.

To get licensed, a business has to carry at least $2 million in commercial general liability insurance and $2 million in automobile liability insurance, and it has to give every client the City’s Landscaping Education Guide. Licences expire every year on October 31.

Five things to check before you hire

A licence is a floor, not a guarantee. It tells you a business met the City’s requirements when it applied. These five checks cover the rest.

1. Their name is on the City’s licensed list

The City publishes a list of licensed hardscape contractors. The version online right now is dated September 3, 2026. Make sure the name on the list matches the name on your quote and contract, not just the name on the truck.

Because licences expire October 31, a contractor you sign with this fall for a spring build should be renewing in the meantime. If you’re not sure, the City’s Business Licensing Centre can confirm it: 613-580-2424 ext. 12735, or businesslicensing@ottawa.ca.

WLS Landscaping Inc. is on that list. We’d still rather you look it up than take our word for it.

2. Insurance, in writing

Ask for a certificate of insurance that names the business and shows policy dates that cover your project. The City’s minimums for a licence are $2 million for general liability and $2 million for vehicles. If a machine cracks your foundation or a delivery truck flattens a neighbour’s fence, this is the policy that pays.

3. A current WSIB clearance

WSIB issues a clearance to businesses that are registered and up to date on their premiums and reporting. WSIB doesn’t require homeowners to collect one for work on their own home, but it’s still a quick way to see that the business you’re hiring is registered and paying in. Clearances are valid for up to 90 days, and you can search a business by name with WSIB’s quick access clearance tool, no login needed. If a contractor can’t produce one, ask why before work starts.

4. A written contract that spells out the work

A handshake and a one-line quote won’t help you if something goes sideways. A good contract covers:

  • the exact scope: areas, sizes, materials and colours
  • base preparation, including excavation depth and compaction (this matters on Ottawa’s clay soils, where freeze-thaw punishes a thin base)
  • who books utility locates and who applies for any permits
  • a payment schedule tied to progress
  • what’s excluded, and how changes get priced before they’re built
  • the warranty, and what it covers

If it isn’t on paper, assume it isn’t in the price.

5. You got the City’s guide

Licensed contractors have to give clients the City’s Landscaping Education Guide. If yours didn’t, that’s a fair question to ask. Either way, it’s worth a read. It’s free and written for homeowners as much as contractors.

What the City’s guide says homeowners should know

Aerial view of a new paver walkway and wide front steps beside a double garage, with fresh sod

The licence is about who does the work. The rules about what can be built haven’t gone anywhere, and they apply whether you hire someone or do it yourself. A few from the guide come up on almost every front yard we look at:

  • The City owns more of your front yard than you think. The strip next to the road is the City’s right of way. The only hard landscaping allowed there is a driveway and walkway, and together they can’t take up more than 50 per cent of your frontage. Boulders, river rock and raised decorative features aren’t allowed there. The guide points to geoOttawa for a rough look at your property lines.
  • You can’t change your lot’s grading. Projects have to follow the approved drainage pattern, and water can’t be sent toward the neighbours unless that’s part of the approved plan.
  • Half the front yard stays soft. The guide says 50 per cent or more of your front lawn has to be soft landscaping, and artificial turf counts as hard landscaping.
  • Taller retaining walls can need a building permit. Walls more than 1 m high need one when they’re next to public property, next to access to a building, or on private property open to the public.
  • Steps still have to meet code. Even without a permit, the rise and run, guards, handrails and landings have to meet the Ontario Building Code.
  • Everyone calls for locates. Provincial law requires locating underground utilities before you dig, even with a hand shovel. That’s Ontario One Call at 1-800-400-2255.

A good contractor should bring these up before you do. If you’re the one raising them, take note.

Where WLS fits

Natural stone steps between an armour stone wall and a flagstone patio, with new garden beds and a cedar fence

We’re a design-build company, and we take on a limited number of projects each season, about 24 this year. That’s on purpose. It means the people who planned your retaining wall or interlock patio are still paying attention when the base goes in.

Being licensed doesn’t make anyone a better builder, us included. It means we’ve done what the City asks. Ask us for the same paperwork we’ve suggested you ask everyone for, and we’ll send it with your quote.

Fall and winter are when we design next spring’s builds, before the booking rush. If you’re thinking about a patio, walkway or wall for next year, book a consultation or call us at (613) 878-7906.

Frequently asked questions

What are the new rules for hardscapers in Ottawa?

Businesses that install, alter or pave hard landscaping on private property, like driveways, patios, walkways, steps and retaining walls, need a City hardscaping contractor licence. To get one, they need $2 million in general liability and $2 million in automobile liability insurance, and they have to give clients the City’s Landscaping Education Guide.

How do I check if a hardscaping contractor is licensed in Ottawa?

Look for the business name on the City’s list of licensed hardscape contractors on ottawa.ca, and make sure it matches the name on your contract. You can also contact the Business Licensing Centre at 613-580-2424 ext. 12735.

Do deck, fence or pool builders need a hardscaping licence?

Not according to the City. Its licence page says pools, decks and fences don’t need one, and neither does driveway sealing on its own. Other City permits can still apply, like a pool enclosure permit.

Does a licence mean the work will be done well?

No. A licence shows the business met the City’s requirements, including insurance. It doesn’t measure workmanship. Look at finished projects, talk to past clients and read the contract closely.

Do I need a permit for a retaining wall in Ottawa?

Sometimes. The City’s guide says a building permit is needed for walls more than 1 m high when they’re next to public property, next to access to a building, or on private property open to the public. If your wall is close to that height or near a property line, check with the City before you build.

Scroll to Top