Our Process
Four stages, the same on every project, so you always know where things stand and what comes next.
Consultation
Every project starts with a conversation, and first conversations are with our team. We walk the property with you and talk through how you want to use the space, what matters most to you and a realistic price range. We also look at the site itself: grades, drainage, sun, access and what's already there, so the design starts from how your land actually works.
Design
Design takes 6 to 8 weeks. Our designer works up the full plan: 3D renders, construction plans, building details and a planting list, with revisions until it feels right. The design fee depends on the size of the project and is billed directly by the designer. It isn't credited toward the build, because the design is yours to keep. Once it's final, we lay out the scope, sequencing and price so you know exactly what you're getting.
Build
Our own crews build it, with a dedicated project manager handling the schedule, materials and updates. We book utility locates, keep the site organized and clean, and respect your home and daily routine. You'll always know what's happening and what's next, without feeling overwhelmed.
Warranty and Care
Before we call it done, we walk the finished space with you to make sure every detail matches the plan. Interlock and retaining walls come with a 3-year limited warranty covering settling and defects, and if something settles, we come back and fix it. We'll also show you how to care for the space so it keeps getting better over time.
Every space we create starts with a conversation.
Before the Crew Shows Up
Most of what makes a build go smoothly happens in the two weeks before anyone digs.
- Locates and permits: utility locates are booked about two weeks out, and any permits or approvals the job needs are sorted before the start date.
- Materials ordered: stone, block and anything with a long lead time gets ordered early, so the crew isn’t waiting on a delivery halfway through.
- Machines and deliveries booked: we plan where the stone gets dropped and how the machines get in, so your driveway and lawn take as little wear as possible.
- A heads-up before we arrive: you’ll hear from us a couple of days before the crew shows up, with the start date confirmed.
- A site walk on day one: the foreman walks the site before work starts, so the crew knows the plan, the grades and anything on your property to work around.
While We're Building
You shouldn't have to chase anyone to find out what's going on.
Updates You Don't Have to Ask For
Your project manager runs the schedule and keeps you posted, usually twice a week: where the crew’s at, what’s next and anything we need from you.
Our Own Crews
Uniformed crews in company trucks, each led by a foreman who’s on the tools all day. We keep the site tidy while we work.
Built in Stages
Excavation, then base, then stone, then planting and finishing. Each stage has to be right before the next one covers it up.
Changes in Writing
If you want to add or change something mid-build, we price it in writing first, so nothing shows up on the final invoice that you didn’t agree to.
How We Finish a Job
A job isn't done when the crew packs up. It's done when you've walked it with us and you're happy with it.
- A walkthrough together: we walk the finished space with you and go over every part of it against the plan.
- A written punch list: anything that needs a touch-up goes on a list you agree to, and every item gets a name and a date beside it.
- Final payment after the walk: you pay a deposit when you sign and progress payments as each stage is done. The last part is held back until you’ve walked the job with us.
- The warranty: interlock and retaining walls carry a 3-year limited warranty. If something settles, we come back and fix it.
- Looking after it: we’ll show you how to care for what we built, from topping up joint sand to watering new sod and plants.