Deck Builders in Manotick
Decks framed on footings below the frost line, with the permit sorted out when the height calls for one.
- Permit rules checked before pricing
- Footings below the frost line
- Pressure-treated, cedar or composite
- Our own crews, start to finish
Decks in Manotick, Planned for the Lot and Built to Code
We design and build decks in Manotick for houses where the back door sits a few steps or a full storey above the yard, and the yard keeps going a long way past it. The deck is how you get from one to the other. It should be big enough for the table and the barbecue, laid out so the stairs land on a patio or a path instead of a patch of mud, and kept off the septic bed. Underneath, it comes down to footings. Ours go below the frost line, and if your deck's high enough to need a permit, it gets one, with the City inspecting the footings, the framing and the finished deck.
Who We Serve
A new deck usually starts from one of a handful of places.
Residential
A deck gets shaped by the house as much as the yard: how high the back door sits, which way it faces, where the septic bed is. Projects include:
- Replacing a worn-out deck on an older village home
- Raised decks off a walkout or a high back door
- Low decks that step down to a patio or the lawn
- Riverfront homes looking out over the Rideau
- New builds where the back door opens onto nothing yet
Our Deck Building Services
We handle the drawing, the permit question, the footings, the framing and the finish work, with our own crew on every part of the build.
Custom Deck Design
We start with the door you’ll walk out of and the yard you’ll walk down to. Height, size and stair placement all come from there.
- Sized for the table, the barbecue and room to get past both
- Stairs placed to land on a patio, walkway or landing, not a soft spot in the lawn
- Laid out to stay off the septic bed, with footings kept clear of the well
- Guards and railings drawn in from the start, because on a permitted deck the inspector checks those too
We draw the deck alongside the patio, steps and planting in a full landscape design in Manotick, so the levels line up where they meet.
Deck Footings and Framing
Our deck installation in Manotick starts with holes in the ground, and that’s the part we’re fussiest about. A deck on shallow footings rides the frost up and down every winter, and you’ll see it in the stairs first.
- Footings dug below the frost line, set well away from the septic bed and the well
- On permitted decks, the framing’s inspected before a single board goes on
- Stairs and guards built to code and checked at the final inspection
- Machines and lumber staged where they won’t rut the lawn or sit on the septic
Composite Deck Options
We build composite decks in Manotick for people who’d rather spend the summer on the deck than staining it. The trade-offs, plainly:
- No staining or sealing. A wash in the spring is about it.
- It costs more up front than pressure-treated or cedar
- The boards won’t rot or splinter the way wood can, but the frame underneath is usually pressure-treated lumber, so the footings and framing matter just as much
- Darker colours get hot in full sun, so we’ll pick a colour with your yard’s exposure in mind
Deck Add-Ons
As backyard deck builders, we like to plan the extras early, while the frame’s still open and it’s easy to run a wire or add blocking.
- Stairs that come down onto an interlock or stone patio, with the levels set to match
- Lighting on the stairs and posts, with the wiring run before the boards go down
- Privacy screens on the side that faces the neighbours
- Two levels where the yard drops away, instead of one tall deck and a long staircase
What to Know Before You Build a Deck
A deck's a big job on a small footprint. A few straight answers before you decide:
- Height decides the paperwork: in Ottawa, a deck attached to or next to the house with a walking surface more than 600 mm (about 24 in.) off the ground needs a building permit. That brings footing, framing and final inspections, and a little more lead time before we start.
- Wood or composite is a now-or-later choice: pressure-treated costs the least and needs the most care, cedar sits in between, and composite costs the most up front and asks the least of you after.
- A deck plus a patio often beats one giant deck: a modest deck at the door with wide stairs down to a patio gives you two places to sit and keeps the structure smaller.
- The septic bed is off limits: no footings, no machines and no heavy piles on it. On a lot of Manotick properties, that decides where the deck can go.
Our Design-Build Process
Same four steps on every deck, permit or no permit.
- 1. Consultation: We walk the property with you, talk through how you want to use the space and set a realistic price range for your Manotick property. First conversations are with our team.
- 2. Design: Design takes 6 to 8 weeks. You get 3D renders, construction plans, building details and a planting list, with revisions until it feels right.
- 3. Build: We set proper footings, frame the deck and finish it in cedar or composite. Our own crews do the work, with a dedicated project manager handling the schedule, materials and updates.
- 4. Warranty: Interlock and retaining walls come with a 3-year limited warranty, and we walk the finished space with you before we call it done.
More on how a project runs from start to finish and how design works with us.
Why Choose WLS Landscaping?
There's no shortage of deck builders around Ottawa. Here's what you get with us.
No Subcontracted Framing
Every deck’s framed by our own crew, start to end. The foreman runs the job from the deck itself, cutting and fastening alongside everyone else, so questions get answered on the spot instead of at the end of the day.
Deck and Yard Planned Together
A deck designed without the yard below it ends with stairs dropping onto wet grass. We plan where the stairs land, how the deck meets a patio or walkway, and how the ground around it gets graded so water drains away from the foundation.
Decking That Suits the House
We use decking picked for how it handles Ottawa weather: composite that won’t need staining, or cedar and treated wood when that suits the house and the price range. Every deck sits on footings below the frost line so it stays level for years.
Licensed, Insured and Covered
We’re licensed by the City of Ottawa as a hardscaping contractor, covered by WSIB and carry $5 million in liability insurance. You get a written contract, and a project manager who updates you on the schedule, usually twice a week.
Planning a New Deck?
Tell us about the house, the yard and how high that back door sits. You'll talk to our team first. If your deck's likely to need a permit, we'll say so up front. The spring schedule fills early, so fall and winter are a good time to start planning.
Frequently asked questions
Do I need a permit for a deck in Manotick?
It depends on the height. Manotick’s part of the City of Ottawa, so the City’s rule applies: if the deck’s attached to the house or sits right beside it, and the walking surface is more than 600 mm (about 24 in.) above the ground, you’ll need a building permit, with footing, framing and final inspections. Lower decks may not need one. We check what applies to yours before it’s priced and handle the drawings and inspections as part of the job. On riverfront lots, we check the RVCA mapping too.
Composite or wood: which is better for an Ottawa deck?
Composite costs more up front, but it never needs staining and stands up well to freeze-thaw. Pressure-treated costs the least, and cedar has a warmer colour and grain, but both need cleaning and sealing every couple of years to stay that way. We’ll show you samples and talk through what fits your price range and how much upkeep you’re after.
What's included when you build a deck in Manotick?
Design and layout, permits if they’re needed, footings, framing, decking, railings and stairs, plus how the deck ties into your patio, steps and gardens. Lighting and privacy screens can be added. You’ll know exactly what’s included before we start.
Can you build a multi-level deck or one that connects to a patio?
Yes. Some of the best yards pair a deck off the house with a stone or interlock patio below, joined by wide steps. We design them together so the levels, drainage and materials work as one space.
How long does a deck take to build?
A typical deck takes a couple of weeks once we’re on site. Bigger multi-level builds take longer, and permit time comes before that. You’ll get a realistic schedule before anything starts, and we’ll keep you posted if weather moves things around.