Interlock Patios in Nepean

Interlock patios, walkways and steps in Nepean, with old sunken interlock rebuilt from the base up.

Interlock Patio Design and Installation in Nepean

We design and build interlock patios in Nepean, where a lot of the homes in neighbourhoods like Centrepointe, Craig Henry, Crestview and Bells Corners have backyards that were last done decades ago. The interlock out there is often from the 80s or 90s. It's faded, the corners have sunk, tree roots have lifted sections and weeds fill the joints. Topping it up with sand doesn't fix it. We lift it, rebuild the base properly and lay new or reused pavers so the patio stays flat for decades.

Backyard patio with the deck stairs and garden shed

Who Calls Us About Interlock in Nepean

Most of our Nepean interlock calls come from homeowners in established neighbourhoods who are tired of an old patio that rocks underfoot, or who are replacing a deck at the end of its life.

Patio at the foot of the deck stairs

Residential

Most of the Nepean interlock projects we see start as one of these:

Our Interlock Services in Nepean

Design, base, laying and the edges. Here's what goes into interlock that stays level.

Design and Layout

We start with how you use the yard, then size the patio, pick the pavers and plan the steps. For a bigger change, we plan it as part of a full landscape design in Nepean. For materials, base depths and costs across the city, see our main guide to interlock patios in Ottawa. For a recent example nearby, see our backyard patio and gazebo garden project in Nepean.

  • Patio size worked out from the furniture and the walkways around it
  • Paver colours and borders picked to suit the house
  • Steps and landings planned where the patio meets the door

Base and Mature Trees

Older lots in Nepean often have big trees close to the patio. We plan the excavation around the roots, use geotextile where it helps and build the base in compacted layers.

  • Excavation planned to protect the main roots of trees you’re keeping
  • Base compacted in layers so it doesn’t settle
  • Slope built in so water drains away from the house

Rebuilding Old Interlock

Sometimes the old pavers can be lifted and reset on a new base. Other times they’re too worn and new pavers make more sense. We’ll show you which.

  • Pavers lifted and sorted where they’re worth keeping
  • Base dug out and rebuilt, not topped up
  • New edge restraint and polymeric sand
Patio with deck landing and stone steps

Rebuild or Replace?

When old interlock fails, there are two ways to go. Here's how they compare.

  • Lift and relay: the old pavers come up, the base is rebuilt and the same pavers go back down. It works when the pavers are in decent shape and you like the look.
  • Replace: new pavers on a new base. It makes sense when the old ones are faded, chipped or a style you don’t want anymore.
  • Upgrade: large slabs or natural stone instead of interlock, on the same kind of base.
  • Either way: the base gets rebuilt. That’s the part that failed.

Our Design-Build Process

Every interlock project runs through the same four steps we use on every project. Trees, drainage and the base get sorted during the first two.

  • 1. Consultation: We walk the property with you, talk through how you want to use the space and set a realistic price range for your interlock. First conversations are with our team.
  • 2. Design: Design takes 6 to 8 weeks. You get 3D renders, construction plans, building details and a planting list, with revisions until it feels right.
  • 3. Build: We lift the old surface, excavate and rebuild the base in compacted layers, lay the pavers and sweep in polymeric sand, then finish the steps and planting. Our own crews do the work, with a dedicated project manager handling the schedule, materials and updates.
  • 4. Warranty: Interlock and retaining walls come with a 3-year limited warranty, and we walk the finished space with you before we call it done.

More on how a project runs from start to finish and how design works with us.

After: a slab patio, new planting and lawn by the back door

Why Choose WLS Landscaping for Interlock in Nepean?

Old interlock failed because of the base. These are the things we do so yours doesn't.

Built From the Base Up

We excavate to the depth the job needs and compact the base in layers. It’s what keeps the pavers flat.

One Crew, Start to Finish

The same crew takes out the old patio, builds the base and lays the new one. They’re our own people, led by a working foreman.

The Whole Yard in Mind

We plan the patio with the walkways, steps and planting around it. If there’s a pool, see our pool landscaping in Nepean.

A Limited Number of Projects

We book a limited number of projects each season. Our team takes the first call, and once you’re on the schedule, a dedicated project manager orders the material, books the deliveries and sends you an update, usually twice a week.

Planning Interlock in Nepean?

Tell us what's there now and how you'd like to use the yard. Your first conversation is with our team. We'll walk it with you, tell you whether the old pavers are worth keeping and give you a realistic price range before you spend anything on design.

Frequently asked questions

Small sunken areas can sometimes be lifted and reset. When the whole patio has moved, the base has failed, and the right fix is to rebuild the base under it.

Not if it’s planned around them. We keep excavation away from the main roots of trees you’re keeping and adjust the patio’s shape where we need to.

Most patios take one to two weeks on site. Taking out an old patio or deck adds a day or two. Design comes first and takes 6 to 8 weeks.

A patio at ground level usually doesn’t. The City’s building permit page lists landscaping as not needing a building permit, and the work still has to follow the Ontario Building Code and zoning.

It depends on the size, the pavers, removal of the old surface and the steps around it. Our interlock patio cost guide explains what drives the price.

Scroll to Top